Products Early access
The Nucleus
A digital inspection management platform for NDT and integrity teams.
The Nucleus centralises the whole inspection department. Field data, reports and asset condition live in one place, and every inspection is screened for what the asset needs next.
What it does
Automated reporting
Inspection reports are generated from the data your team records in the field, in one consistent format, without retyping.
Live asset tracking
Each asset's inspection history, current condition and next due date, kept in one view that updates as inspections are logged.
Automated assessment reports
Assessment reports are drafted from inspection results, ready for a qualified engineer to review and sign off.
Golden Flag
Screening and triage after every inspection.
After every inspection, The Nucleus screens the results against corrosion rate, remaining life, RBI and FFS criteria. It then flags what the asset needs next: a full FFS assessment, an RBI review, or retirement.
Golden Flag tells your engineers where to look first. It is a screening step, not an engineering assessment: every flag is a recommendation for review by a qualified engineer, who makes the final call.
Illustration with sample values. Golden Flag screens each inspection against four criteria, then suggests one next step for an engineer to review.
Example: Piping circuit P-204. Corrosion rate: 0.42 mm/y, outside limits. Remaining life: 2.8 years, outside limits. RBI criteria: Within interval, within limits. FFS criteria: Local thinning below t-min, outside limits. Flag: Full FFS assessment.
Example: Pressure vessel V-101. Corrosion rate: 0.18 mm/y, outside limits. Remaining life: 14.6 years, within limits. RBI criteria: Assumed rate exceeded, outside limits. FFS criteria: Above t-min, within limits. Flag: RBI review.
Example: Storage tank, shell course 1 T-310. Corrosion rate: 0.65 mm/y, outside limits. Remaining life: 0.6 years, outside limits. RBI criteria: Risk above tolerance, outside limits. FFS criteria: Below retirement thickness, outside limits. Flag: Retire.
Inside the platform
See The Nucleus on a workflow like yours
Tell us how your team inspects and reports today, and we will walk you through it with that in mind.